The global site of the UK's leading magazine for automation, motion engineering and power transmission
16 April, 2024

LinkedIn
Twitter
Twitter link

Novel pump slashes maintenance times by up to 95%

02 February, 2009

The pump-maker Mono NOV has developed a PC (progressing cavity) pump which can be maintained on site in just 30 minutes, compared to the day-long maintenance operation previously needed for pumps of this type. The company is hailing it as “the biggest leap forward in PC pump design for 30 years”.

The development followed a survey of water industry customers, which revealed that “ragging” blockages caused by objects in the fluid – was becoming a serious problem, because of unsuitable items finding their way into sewers.

“Current options available to engineers are limited, time-consuming and, in some cases, unsafe,” reports Simon Lambert, Mono’s general manager for Europe. “Our aim was to produce a pump that would minimise plant downtime and maintenance.”

The new pump can cut the maintenance time needed to replace a rotor, stator, coupling rod and drive train by 95%. “The average time to completely strip down a pump and replace the drive train elements is one full day,” Lambert says. “The Mono EZstrip reduces this to just a 30-minute job. Many of our customers can’t believe that it is possible to de-rag and maintain a pump so quickly, so we have produced a video, which is now posted on our Web site.”

The pump, an extension of Mono’s Compact C range, can be installed into new plants or retrofitted into existing Compact C installations. It offers capacities up to 165m3/h and 12 bar pressure, and is available in either cast iron or stainless steel.
 




Magazine
  • To view a digital copy of the latest issue of Drives & Controls, click here.

    To visit the digital library of past issues, click here

    To subscribe to the magazine, click here

     

Poll

"Do you think that robots create or destroy jobs?"

Newsletter
Newsletter

Events

Most Read Articles